![]() Accumulation of solid wastes must be kept to minimum practical quantities. Storage - All solid waste deposited at the site must be confined to the designated dumping area.In addition to describing normal facility operations (such as hours, staffing and daily operations) the facility must comply with the following operational requirements: This type of plan is used to describe how you intend to operate your facility in compliance with the applicable regulations. Truck Washing Facilities - Truck washing areas, if provided, must be hard surfaced and all wash waters must be conveyed to a catch basin, drainage and disposal system approved by the Department or state or local health agency having jurisdiction.Solid Waste Disposal - Sanitary waste disposal must be accomplished in a manner approved by the Department or state or local health agency having jurisdiction.Fences - Access to the site must be controlled by means of a complete perimeter fence and gates which may be locked.Fire Protection - Fire protection must be provided in accordance with plans approved in writing by the Department and in compliance with pertinent state and local fire regulations.Drainage - The site must be designed such that surface drainage will be diverted around or away from the operational area of the site.Access Roads - All weather roads must be provided from the public highways or roads, to and within the disposal site and must be designed and maintained to prevent traffic congestion, traffic hazards and dust and noise pollution.Waste Water Discharge - There must be no discharge of wastewater to public waters except in accordance with permits from the Department, issued under ORS 468B.050. ![]() The design and construction plan must meet the following requirements: Once approved, these plans become an enforceable part of your permit.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |